Project Name |
City |
Business |
Scope of Works |
| International Nickel Indonesia , PT |
Sorowako |
Mining |
Design and Build Air Conditioning System at Hydro Power Plant | Design and Build office split ducted air conditioning unit |
| Hyatt Regency Jogjakarta |
Jogjakarta |
Hotel |
Annual Visist Chiller | Repair Chiller | Coil condenser replacement job |
| Astra Honda International |
Bali |
Commercial |
Maintenance contract chiller | Repair chiller | Fan coil unit maintenance visit contract | Building load calculation |
| Inna Grand Bali Beach |
Bali |
Hotel |
Repair chiller watercooled screw |
| Ayodya Resort |
Bali |
Hotel |
Overhaul centrifugal chiller | Module control repair | Air Side Design for Air Conditioned Restaurant |
| Asindo |
Balikpapan |
Mining |
Parts Supply |
| Gatoel Hospital |
Mojokerto |
Hospital |
Construction Civil and Mechanical Work for New Building |
| Swiss Belhotel |
Tarakan |
Hotel |
Repair and Maintenance chillers unit | Room Airside control supply |
| Indah Kiat Pulp and Paper, PT |
Sumatera |
Industrial |
Overhaul Absorption chillers unit |
| Grapari Telkomsel |
Sorong |
Commercial |
Split Unit Air Conditioning supply |
| Semen Tonasa, PT |
Sulawesi |
Industrial |
Maintenance contract Ac and repair chiller unit | AHU maintenance | Fire fighting re-installation | Air Dryer system installation |
| Effem, PT |
Makassar |
Industrial |
Cooling Tower refurbishment |
| Conrad Resort and Spa |
Bali |
Hotel |
Re-insulation chiller | Condenser Water Cleaning Job | Repair chiller job |
| Hevindo Sydney Elohim ,PT |
Balikpapan |
Mining |
Parts Supply |
| Total Indonesie, PT |
Balikpapan |
Mining |
Conversion of refrigerant at hazardous area | Maintenance Contract Chiller | Re-commisioning chiller | Oil Replacement job | Chiller control installation |
| MCI Prima Gasket, PT |
Surabaya |
Industrial |
Repair and re-commissioning chiller scroll aircooled units |
| Top Ten Club 360 |
Surabaya |
Entertainment |
AHU supply and installation | Duct design | Chilled Water Side and Air Side Control system supply | Start-up chiller unit | Cooling coil AHU replacement | automatic tube cleaner tools supply |
| Satelit Hotel |
Surabaya |
Hotel |
Repair and re-commissioning chiller screwl aircooled units | Parts supply |